Download PDFOpen PDF in browser

Analysis of Delay Causes Using BIM

EasyChair Preprint no. 4781

7 pagesDate: December 25, 2020

Abstract

Delay in the field of the construction industry is an inevitable problem with the many project activities, which may have reached me thousands of activities related to the supply of materials and the adoption of engineering drawings, which may lead to bleeding the scope of work first and then disputes and most of them lead to arbitration and not satisfy the stakeholders, so it was necessary to review the literature for study and analysis Reasons for the delay, and analysis delay by linking them to new technology, which is the BIM, for the construction industry to study its delays impact on the life of the project and to protect stakeholders from losing the scope of work by dealing with it in a proactive way to avoid its impact on the causes of delay during construction. A literature review was conducted to compile a list of most delay causes firstly and degree impact of using BIM to analyze delay that was structured questionnaire. The resulting list of delay causes was selected to a questionnaire survey and application Model selected to take into consideration of the most important causes of delay, The overall results indicated that by using BIM technology during construction it reduces the effect of delay project and scope creep by Study project case, and review of effects BIM on delay causes it was established by literature and interviews. Results' analyses suggest that to significantly avoiding delay causes and its analysis a joint effort based on coordination with all parties and using BIM technology for delay analysis reports during the project life cycle, furthermore, the causes of project delay were discussed based most of the overall projects in the construction industry.

Keyphrases: abstract, Causes of Delay in Literature, Introduction

BibTeX entry
BibTeX does not have the right entry for preprints. This is a hack for producing the correct reference:
@Booklet{EasyChair:4781,
  author = {Mohamed Marey and Nabil Amer and Ahmed Ehab Amer},
  title = {Analysis of Delay Causes Using BIM},
  howpublished = {EasyChair Preprint no. 4781},

  year = {EasyChair, 2020}}
Download PDFOpen PDF in browser