Download PDFOpen PDF in browser

Workability Conditions Determination of Network Distribution with Overhead Lines Power Transmission with the 6-35 kV

EasyChair Preprint no. 6141

7 pagesDate: July 23, 2021

Abstract

The principal of identification of isolation workability in relation to a ground was proposed. It is based on the electrosafety criteria usage and a minimum current flow to a ground. The conditions of workability of isolation of distribution network is calculated in look of changes of isolation workability restrictions in relation to regulations and standards.A mathematical model for the calculation of isolation workability in a look of a relation of workability indicators to the isolation parameters according to a ground. By analyzing the adequacy it as set that introduced formed models assumptions result in the appearance of a method error to 3,5 %.

Keyphrases: determination of working conditions, Diagnostic complex, distribution network, isolation control

BibTeX entry
BibTeX does not have the right entry for preprints. This is a hack for producing the correct reference:
@Booklet{EasyChair:6141,
  author = {Vasiliy Kutin and Marina Kutina and Artem Kovalov and Sergyi Maksimov},
  title = {Workability Conditions Determination of Network Distribution with Overhead Lines Power Transmission with the 6-35 kV},
  howpublished = {EasyChair Preprint no. 6141},

  year = {EasyChair, 2021}}
Download PDFOpen PDF in browser